pghbridges.com

allegorical carving from Allegheny County Office Building; 1929-31; Stanley L. Roush, architect

BRIDGES AND
TUNNELS OF
ALLEGHENY
COUNTY,
PENNSYLVANIA

. . . . . . . . . . . . . . .
Introduction
. . . . . . . . . . . . . . .
What's New
. . . . . . . . . . . . . . .
Tours
. . . . . . . . . . . . . . .
Search
. . . . . . . . . . . . . . .
STRUCTURES
List by Location
List by Design
List by Name
List by Use
. . . . . . . . . . . . . . .
OTHER INFO
Articles
Bridge Basics
Regional Maps
. . . . . . . . . . . . . . .
Terminology
 : Engineering
 : Masonry
 : Metal
 : Bridge
 : Tunnel
 : Mapping
. . . . . . . . . . . . . . .
About This Site
Info Sources
Related Sites
Feedback
. . . . . . . . . . . . . . .

Home > All By Location regional map > Glassport > Clairton-Glassport Bridge 1928-1987
drawing of bridge
OFFICIAL NAME:

OTHER DESIGNATION:
Clairton-Glassport Bridge
Glassport-Clairton Bridge

LOCATION:
Clairton - Glassport

USGS 7.5" Topo Quad - UTM Coordinates:
Glassport - Zone 17; 0594 4462


CARRIED:
motor vehicles

BETWEEN:
-- right descending bank of Monongahela River; Monongahela Av, Glassport
-- left descending bank of Monongahela River; State St, Clairton

CROSSED:
-- Monongahela River at mile 19.3


TYPE OF CONSTRUCTION / DESIGN:
Spandrel-braced deck arch (cantilever) trusses on stone piers

LENGTH OF MAIN SPAN:

TOTAL LENGTH (including longest elevated ramp):
2,562 ft

HEIGHT OF DECK:

YEAR ERECTED / ENGINEER:
1928, County of Allegheny


ADDITIONAL INFO:
from the Duquesne Times, September 7, 1928:

This structure, connecting the City of Clairton with the Borough of Glassport, was authorized by the people of Allegheny county in the bond issue of April 22, 1924. Construction was started by the board of county commissioners in august 1926.

The new bridge is a deck cantilever structure with arched bottom chords similar to Liberty bridge, Pittsburgh. The main bridge structure is 1,534 feet long, consisting of three river spans, totaling 900 feet, and two approach spans, each 317 feet long. At the Clairton end is a deck plate girder viaduct 678 feet long and a reinforced concrete ramp 350 feet long, making the total length of the bridge and approaches 2,562 feet.

To obtain a satisfactory connection between State street, Clairton, and the bridge roadway it was necessary to construct an approach ramp 350 long at a five percent grade, paralleling State street. The approach at Glassport end involved major changes as to grades and widths of the Glassport road.

The roadway is 21 feet wide between curbs and is surfaced with asphaltic concrete on a concrete base. There are two sidewalks each eight feet wide.

Replaced with new structure opened in 1987. The new bridge was built upon the original piers with concrete extensions.

FIELD CHECKED:

INFO SOURCES:
Jim Hartman (www.15122.com/mths) Homestead & Mifflin Township Historical Society


Submit info or inquiry - share some facts or ask a question.

Introduction -- Nearby Structures

Last modified on 14-May-2004
copyright 1997-2004 Bruce S. Cridlebaugh