pghbridges.com

allegorical carving from Allegheny County Office Building; 1929-31; Stanley L. Roush, architect

BRIDGES AND
TUNNELS OF
ALLEGHENY
COUNTY,
PENNSYLVANIA

. . . . . . . . . . . . . . .
Introduction
. . . . . . . . . . . . . . .
What's New
. . . . . . . . . . . . . . .
Tours
. . . . . . . . . . . . . . .
Search
. . . . . . . . . . . . . . .
STRUCTURES
List by Location
List by Design
List by Name
List by Use
. . . . . . . . . . . . . . .
OTHER INFO
Articles
Bridge Basics
Regional Maps
. . . . . . . . . . . . . . .
Terminology
 : Engineering
 : Masonry
 : Metal
 : Bridge
 : Tunnel
 : Mapping
. . . . . . . . . . . . . . .
About This Site
Info Sources
Related Sites
Feedback
. . . . . . . . . . . . . . .

Home > All By Location regional map > Glassport > Clairton-Glassport
photo of bridge
elevation drawing looking downstream
photo of bridge elevation drawing looking downstream
OFFICIAL NAME:

OTHER DESIGNATION:
Clairton-Glassport Bridge
glas594-12

LOCATION:
Clairton - Glassport

USGS 7.5" Topo Quad - UTM Coordinates:
Glassport - Zone 17; 0594 4462


CARRIES:
motor vehicles

BETWEEN:
-- right descending bank of Monongahela River; Monongahela Av, Glassport
-- left descending bank of Monongahela River; State St, Clairton

CROSSES:
-- (RDB to LDB) CSX [PLE RR]; Monongahela River at mile 19.3; USX Clairton Coke Works; Union RR; NS RR [Conrail]


TYPE OF CONSTRUCTION / DESIGN:
Welded girder with bolted splice plates; deck concrete beam viaducts

LENGTH OF MAIN SPAN:
385.6 ft

TOTAL LENGTH (including longest elevated ramp):
2,890 ft

HEIGHT OF DECK:

Lock and Dam No. 2, Braddock, normal pool level 718.7 ft

YEAR ERECTED / ENGINEER:
1987, PennDOT


ADDITIONAL INFO:
Modern bridges typically look like, well, modern bridges. And this modern structure crosses the river in seven massive girder sections (3 stringers wide), where since 1928 a much more complicated spandrel-braced arch had stood.

Signs of the previous structure still remain in the river piers. Reminiscent of the Washington Monument which was stalled during construction and resumed using stone which didn't match, these river piers rise from the water as the original stone columns. Half again the height of the exposed stone, each pier is extended in concrete to carry the new girders.

At each end, concrete beam stringers rest on concrete hammerhead piers to carry short, simple spans to the steel girder section. On the Glassport side, there are 3 of these spans; in Clairton, a viaduct of 10 short spans extend the roadway over the USX Clairton Coke Works and down to a landing at State St.

The construction photo is from Century Steel Erectors of Dravosburg, PA.

FIELD CHECKED:
03-June-2000

INFO SOURCES:
USACE Monongahela River Nav. Charts


Submit info or inquiry - share some facts or ask a question.

Introduction -- Nearby Structures

Last modified on 15-June-2000
copyright 1997-2000 Bruce S. Cridlebaugh