logo

BRIDGES AND
TUNNELS OF
ALLEGHENY COUNTY,
PENNSYLVANIA

Introduction
List by Location
List by Design
List by Name
List by Use

Search This Site

Article Index

Frederick Law
Olmsted
report to the
Pittsburgh Civic Commission

"Pittsburgh:
Main Thoroughfares and The
Down Town District"
1910

00 Cover Page

00 Contents

01 Down Town
   District

02 Main
   Thoroughfares

03 Surveys and
   a City Plan

04 Parks and
   Recreation
   Facilities

05 Special
   Reports

06 Index


PART V: Special Reports
The City and The Allegheny River Bridges

Pittsburgh: Main Thoroughfares and The Down Town District
Frederick Law Olmsted report to The Pittsburgh Civic Commission, 1910


page 159

Contents : Previous : Next


For all of the above reasons we believe that to precipitate the actual reconstruction of the bridges at this time would be most undesirable for the city and prejudicial to the best results, in the long run, for all concerned.

RECOMMENDATIONS

In conclusion we beg to recommend as follows: 1. That the Sixteenth Street and Forty-third Street bridges, which are obstructions to navigation on account of their pier locations, narrow channels, and exceptionally low clearance height, be required to be rebuilt with their piers so located as to give channels conforming to the neighboring bridges, and that their elevation be fixed with regard to eliminating the railroad grade crossings on their approaches, but the minimum clearance shall be fixed in accordance with the closing paragraph below.

2. That the Ninth Street bridge should be rebuilt as soon as practicable with a center pier and two wide spans conforming to those of the Sixth Street and Seventh Street bridges. The design of the new Ninth Street bridge, however, should not be finally determined and erection begun until a definite plan for comprehensive improvements in the traction system between the two sides of the river has been decided upon. Unless new circumstances develop before the construction of this bridge is begun that materially affect the problem of clearance height, the elevation should be fixed in accordance with the closing paragraph below.

3. That all questions pertaining to changing the elevation of the Sixth Street, Seventh Street, Fort Wayne, Thirtieth Street and Junction Railroad bridges be deferred to await the report of the Pittsburgh Flood Commission and the resultant action; to await the report on a comprehensive plan for traction improvements; to await the completion of the work projected by the City in cutting down some streets and filling others; and to await the results of investigation of river-boat design and construction provided for in the River and Harbor bill just passed by Congress.

4. That, if it is deemed essential and necessary at present to decide upon the elevation to which all Allegheny River bridges must be made to conform, this elevation be fixed so that there shall be a clear head room of substantially 37 feet above pool level, varied so as to give at each bridge a clear head room


Contents : Previous : Next