Frederick Law
Olmsted
report to the
Pittsburgh Civic Commission

"Pittsburgh:
Main Thoroughfares and The
Down Town District"
1910

00 Cover Page

00 Contents

01 Down Town
   District

02 Main
   Thoroughfares

03 Surveys and
   a City Plan

04 Parks and
   Recreation
   Facilities

05 Special
   Reports

06 Index


PART V: Special Reports
The City and The Allegheny River Bridges

Pittsburgh: Main Thoroughfares and The Down Town District
Frederick Law Olmsted report to The Pittsburgh Civic Commission, 1910


page 143

Contents : Previous : Next


TABLE SHOWING EFFECTIVE ENERGY REQUIRED TO OVERCOME RISE OVER BRIDGES AT VARIOUS HEIGHTS

Elevation in feet above pool level of under side of bridge over 360' channel.Present37'42'47'
Tons per annumFoot tons of effective energy
Sixth Street bridge13,240,01099,300,075137,696,104203,896,154270,096,204
Ninth Street bridge14,732,130151,740,939195,937,329269,597,979343,258,629
Per cent of increase of effective energy required
Sixth Street bridge38.6%105.3%172.0%
Ninth Street bridge29.1%77.7%126.2%

At the Sixth Street bridge there is at present an undesirably steep gradient* on the Allegheny, or North Side, approach, but it is only 230 feet long and being paved with stone gives a good foothold for horses. This is to be greatly benefited by filling up the street with material taken from the "Hump" grading, the plans on file in the City Bureau of Construction providing for an improved gradient of only 2.22 per cent. Many of the abutters have already waived their damages and there is no question that the improvement will be made. The present bridge gradients and those of the Pittsburgh approach are less than 3 per cent. At the Seventh Street bridge the gradients do not exceed 3 per cent, except on the Allegheny approach where it is now being reduced to 2 per cent. At Ninth Street, while the present bridge gradients do not exceed 2.8 per cent, there is a short pitch about 100 feet long in the approach on the Allegheny side with a grade of 5.24 per cent.** A small amount of regrading, involving no heavy property damages, will suffice to reduce these gradients to 1.3 per cent, and appropriations for this improvement have already been made by the City.

The existing grades at the Sixteenth Street, Thirtieth Street and Forty-third Street bridges are light, but it is not important to consider these bridges in detail in this connection as it is probable that the necessity for eliminating railroad grade

*3.64 per cent (United States Engineers, Office) or 4.0 per cent. (City Bureau of Construction.)

** Given as 6.35 per cent on United States Engineers' Sections.


Contents : Previous : Next


Submit info

Website Introduction

Last modified on 22-Dec 1999
Design format: copyright 1997-1999 Bruce S. Cridlebaugh
Original document: Frederick Law Olmsted, 1910