logo

BRIDGES AND
TUNNELS OF
ALLEGHENY COUNTY,
PENNSYLVANIA

Introduction
List by Location
List by Design
List by Name
List by Use

Search This Site

Article Index

Frederick Law
Olmsted
report to the
Pittsburgh Civic Commission

"Pittsburgh:
Main Thoroughfares and The
Down Town District"
1910

00 Cover Page

00 Contents

01 Down Town
   District

02 Main
   Thoroughfares

03 Surveys and
   a City Plan

04 Parks and
   Recreation
   Facilities

05 Special
   Reports

06 Index


PART II: Main Thoroughfares
Pittsburgh: Main Thoroughfares and The Down Town District
Frederick Law Olmsted report to The Pittsburgh Civic Commission, 1910


page 81

Contents : Previous : Next


Carson Street. Chartiers Avenue and Corliss Street will thus form a short line of fair gradient to the high portions of Sheraden and Esplen.*

68. Crafton Hillside Thoroughfare. -- From Main Street (West End) the Noblestown Road is a main thoroughfare on reasonable gradients to Carnegie and points south and east. From the sharp turn near Stratford Avenue (Chartiers township) a main branch into Crafton should follow the present street railway line. On the steep hillside it should be constructed as a three-level street, cars in the middle and a roadway on either side.

69. Crafton-Carnegie Connection. -- There is no direct connecting highway between Crafton and Carnegie. A street should be constructed from Ridge Avenue to Idlewood Avenue along the street car line just north of the Panhandle Railroad.

70. Washington Road. -- Washington Road through Greentree borough is an important hilltop thoroughfare feeding into West Carson Street through the West End. From the hilltop down to Woodville Avenue it is undesirably steep. A new road should be built from the top of the hill running northward down the west bank of the valley, rounding the nose of the hill and running west about a thousand feet, then crossing the ravine on a viaduct and joining the Noblestown Road just west of West End Park. The gradient on such a road would not be over five per cent.

71. Sawmill Run Thoroughfare. -- Sawmill Run valley offers a splendid opportunity for a connecting and radial thoroughfare from the West End to Bell Tavern and thence south to Fairhaven, Castle Shannon, and points beyond in Bethel, Snowden and Jefferson townships. Branching to the southwest would be at least two important valley thoroughfares, the Banksville and West Liberty Roads. Woodville Avenue, from the West End through Shalerville, is the start of such a thoroughfare. It should be improved and extended up the valley, past the Bell Tavern, to Oak Station and the Library Road. Such a thoroughfare should be designed as part of a boulevard system.**

The proposed traffic tunnel to the South Hills will come out in the valley between Mt. Washington and Beltzhoover, probably a little east of the south portal of the present street car tunnel. To serve its best purpose this traffic tunnel must have thorough

* This improvement is provided for in the current bond issue.

** Part IV, Section 7, page 119.


Contents : Previous : Next


Submit info

Website Introduction

Last modified on 22-Dec 1999
Design format: copyright 1997-1999 Bruce S. Cridlebaugh
Original document: Frederick Law Olmsted, 1910