logo

BRIDGES AND
TUNNELS OF
ALLEGHENY COUNTY,
PENNSYLVANIA

Introduction
List by Location
List by Design
List by Name
List by Use

Search This Site

Article Index

Frederick Law
Olmsted
report to the
Pittsburgh Civic Commission

"Pittsburgh:
Main Thoroughfares and The
Down Town District"
1910

00 Cover Page

00 Contents

01 Down Town
   District

02 Main
   Thoroughfares

03 Surveys and
   a City Plan

04 Parks and
   Recreation
   Facilities

05 Special
   Reports

06 Index


PART II: Main Thoroughfares
Pittsburgh: Main Thoroughfares and The Down Town District
Frederick Law Olmsted report to The Pittsburgh Civic Commission, 1910


page 78

Contents : Previous : Next


At Millvale the grade must be raised to meet a new approach over the railroad to the Forty-third Street bridge. (Section 6.)

58. Millvale thoroughfare. -- Girty Run valley, at the mouth of which is Millvale, must inevitably be the route of the trunk line for a most important northern thoroughfare system. Thoroughfares following Girty Run and its numerous branches can reach Westview, Perrysville and all parts of Ross and McCandless townships and points north, on reasonable gradients.

From the mouth of the valley up to Evergreen, the present thoroughfare, comprising Grant Street, North Avenue, Klopfer Street, and the Evergreen Hamlet Road, is narrow and in some cases very crooked, and is more or less closely lined with buildings. Improvements on this line have not been studied in detail but much widening and some re-alignment is urgently needed. Probably the widening of Grant Street will be more satisfactory than paralleling it with a new street.

59. Etna Improvement. -- Etna is at the mouth of the Pine Creek valley, the route of another very important thoroughfare system. Butler Pike, the Middle Road, Kittanning Pike and the three valley roads following Pine Creek and the two Little Pine Creeks, reaching all available country to the north on easy gradients, converge at Etna.

To avoid the bottle neck at the Spang-Chalfant mills a new street should be run west of the mills from Bridge and Butler Streets over the creek and the railroad, joining Butler Street again a little west of the Kittanning Pike. A branch should descend from this overhead street westerly to the street which parallels the railroad tracks on the south and connects directly with the Butler Pike and the line up Little Pine Creek west.

Further improvements on these thoroughfares have not been studied in detail, but numerous widenings and re-alignments are needed, especially in the Pine Creek thoroughfare.

60. Sycamore Street Grade Crossing and Bridge Street Improvement. -- Bridge, Freeport and Main Streets should be lifted over the Baltimore & Ohio tracks at Sycamore Street. Bridge Street had best be kept up, probably on a viaduct, clear to the Sharpsburg bridge. The South Main Street approach to this bridge will thus be cut off, but another eastern approach will be provided. (Section 61 below.)